Mandatory:
- Provide us with access to the electricity meter, the power supply source of the electrical installation (MV/LV transformer, generator set, etc.), and the entire electrical installation throughout the inspection.
- The circuit diagrams.
- The position plans.
- The position plans of the grounding systems.
- The documents relating to external influences.
If applicable:
The diagrams, plans, and documents mentioned above must be supplemented with:
- Zoning plan
- Zoning report
- List of evacuation routes and difficult-to-evacuate areas
- Plan of safety installations and/or critical installations
- List of safety and/or critical installations
- The owner of an underground electrical line must, at all times, be able to provide the plans of the underground lines or, failing that, provide the necessary information to locate them.
If necessary:
For proper understanding, correct installation, and safe operation, these diagrams, plans, and documents must be supplemented with:
- Functional diagrams
- Execution diagrams
- General equipment layout plans