Prepare for our visit for the EPC acceptance inspection of a natural gas boiler (Heating EPC)

Follow our practical advice and gather all the necessary documents for a fast and stress-free heating EPC acceptance inspection.

Mandatory:

  • The heating system (radiators, thermostatic valve, thermostat, etc.) as well as the boiler must be installed and operational.
  • The logbook.

Download the logbook

Mandatory:

  • The heating system (radiators, thermostatic valve, thermostat, etc.) as well as the boiler must be installed and operational.
  • The logbook.

Download the logbook

A question ?

For more practical information or questions about preparing for the EPC heating inspection:

Check out our FAQ I’d like to contact you