FPS Economy approved body

Photovoltaic electrical inspection: secure your solar installation

Have your photovoltaic installation inspected by an approved body. Official RGIE report, valid for commissioning, modification or sale.

  • Order 7 days a week
  • Fast intervention
  • Instant report
Photovoltaic Electrical Inspection by Certinergie: Ensure the Safety of Your Solar System

+15 years

of experience

50.000+

inspections completed

€165

all-inclusive rate

Belgium

national coverage

RGIE regulations

Why is the photovoltaic electrical inspection mandatory?

The General Regulations on Electrical Installations (RGIE) require a compliance inspection for every photovoltaic installation in Belgium. Here are the situations concerned:

Commissioning
Mandatory

Every new photovoltaic installation must be inspected before being commissioned by the grid operator.

Arrows-ccw Arrows-ccw

Installation modification
Mandatory

Adding panels, replacing the inverter or extending power: a new inspection is required.

Property sale
Mandatory

The electrical inspection report (including the PV installation) must be handed over to the buyer upon sale.

Adding a home battery
Mandatory

Installing a storage system modifies your electrical installation and requires a compliance inspection.

Adding an EV charging point
Mandatory

An electric vehicle charging point impacts your installation: an inspection guarantees safety.

Only an approved body can issue a valid inspection report

Your photovoltaic installer cannot carry out this inspection themselves. Only an inspection body approved by the FPS Economy, such as Certinergie, is authorised to issue an official report compliant with the RGIE.

This report is essential to obtain grid connection and benefit from prosumer tariffs or digital meters.

Our photovoltaic inspection packages

Clear, all-inclusive pricing. Choose the package suited to your installation.

Photovoltaic < 10 kVA

Standard solar installation

€165 incl. VAT

  • Full PV installation inspection
  • Inverter & wiring check
  • Official RGIE report
  • Valid for commissioning or sale
Popular

PV + EV charging point

Photovoltaic with EV charger

€185 incl. VAT

  • Photovoltaic installation inspection
  • EV charging point inspection
  • Residual current protection check
  • Single official report

PV + Home battery

Photovoltaic with storage

€165 incl. VAT

  • Photovoltaic installation inspection
  • Storage system inspection
  • Earthing verification
  • Single official report

PV + Charger + Battery

Complete installation

€165 incl. VAT

  • Photovoltaic installation inspection
  • EV charging point inspection
  • Home battery inspection
  • Complete official report

All prices are inclusive of VAT and include travel, inspection and official report.

Installation > 10 kVA? Contact us for a custom quote.

Why choose Certinergie for your photovoltaic inspection?

More than just an inspection: Certinergie supports you from booking to final report with professionalism and responsiveness.

Officially approved body

Certinergie is approved by the FPS Economy to carry out electrical inspections under the RGIE. Our reports are recognised by all grid operators.

15+ years of experience

Since 2008, we have been supporting private individuals and professionals in their electrical compliance procedures in Belgium.

100% compliant reports

Our inspection reports are accepted by all notaries, grid operators (ORES, RESA, Sibelga, Fluvius) and administrations.

Fast intervention

Appointments available within 48-72h. Simple online scheduling, confirmed immediately.

National coverage

We operate throughout Belgium: Wallonia, Brussels and Flanders. A team near you.

Responsive customer support

A question? Our team answers quickly by phone or email. Support before and after the inspection.

Certinergie, your trusted partner

Join the thousands of property owners who trust us every year.

How does the inspection work?

A simple and fast process, from booking to receiving your official report.

01

Online order

Select your package and complete your installation information. Secure payment in a few clicks.

02

Quick scheduling

Choose a slot that suits you. Appointment confirmed by email and SMS. Intervention possible within 48-72h.

03

Inspector visit

Our approved expert checks the compliance of your photovoltaic installation according to RGIE requirements.

04

Official report

Receive your inspection report immediately after the inspection. Document valid for the grid operator and the notary.

30-45 min

Average inspection duration

Immediate

Report handed over on site

25 years

Report validity (if compliant)

Frequently asked questions

Everything you need to know about the photovoltaic inspection

Answers to the questions most frequently asked by our customers.

Yes, the RGIE requires a compliance inspection for every new photovoltaic installation before commissioning. This inspection is also mandatory after any modification to the installation or upon sale of the property.

Absolutely. Our inspection report is an official document recognised by all notaries in Belgium. It is part of the mandatory documents to be handed over to the buyer upon signing the deed of sale.

If your installation is compliant, the report is valid for 25 years. In case of non-compliance, you have 18 months to carry out the remedial works, after which a reinspection will be required.

Yes, your presence or that of an adult representative is required. The inspector will need access to the electrical panel, the inverter and possibly the roof. Allow approximately 30 to 45 minutes.

Don’t panic! Our inspector will clearly explain the points to be corrected. You have 18 months to carry out the works. We can refer you to qualified electricians a

No. Only an inspection body approved by the FPS Economy can carry out this inspection and issue an o

Please provide the single-line diagram of your installation, the position plan, the conformity certificates for the equipment (inverter, panels) and the EAN code if available. The installer should normally provide you with these documents.

Ready to have your photovoltaic installation inspected?

Book now and receive your official RGIE report within a few days. Simple, fast, compliant.

Book my inspection now 02 880 21 71
  • RGIE approved body
  • Intervention within 48-72h
  • Instant report

© Certinergie NPO – VZW rue Haute Voie 5 4537 Verlaine / Chaussée de Tirlemont 156, 5030 Gembloux / Brusselsesteenweg 599,3090 Overijse / Avenue Louise 367 1050 Bruxelles RPM ASBL 0536.501.654. RPM SRL 0831.937.722. Certinergie Luxembourg SARL